Project portfolio

All projects in one clear portfolio.

This page consolidates the project entries presented in the August 2026 AFRAZ Supplier International company profile. Project values, employers, investors/funding agencies and status are reproduced as stated in that profile.

12Project entries consolidated
6Current / ongoing / scheduled
6Completed
Current portfolio

Ongoing & scheduled works

Projects shown as ongoing, or carrying a future tentative completion date, in the supplied profile.

Interconnection, Washout & Optical Chambers — Raw Water Pipeline Ongoing
Water Infrastructure

Interconnection, Washout & Optical Chambers — Raw Water Pipeline

Civil construction package for the raw-water pipeline under Gandharbpur Water Treatment Plant.

LocationAraihazar, Narayanganj
ClientSUEZ-OTV Veolia, France
Contract valueBDT 6.25 Million
Duration1 Year
RoleSubcontracting from ARIDOD Tech Serve Ltd.
Profile statusOngoing
  • Construction of interconnection chamber
  • Washout chamber works
  • Optical chamber works
  • Raw-water pipeline related civil works
Saddle Weight Construction & Installation — Chittagong-Dhaka Oil Pipeline Ongoing
Oil Pipeline / Civil

Saddle Weight Construction & Installation — Chittagong-Dhaka Oil Pipeline

Construction and installation of saddle weights for the oil pipeline corridor.

LocationSitakundu, Chittagong
Client24 Engineer Brigade, Bangladesh Army
Contract valueBDT 2.5 Million
Duration5 Months
RoleSubcontracting from ARIDOD Tech Serve Ltd.
Profile statusOngoing
  • Construction of saddle weights
  • Installation for oil pipeline
  • Site civil and placement activities
Piling Works for Electric Towers — HKEG Solar Power Plant Ongoing
Solar / Foundation Works

Piling Works for Electric Towers — HKEG Solar Power Plant

Piling works for electric towers along the Sunamganj-to-Dharmapasha corridor under the HKEG Solar Power Plant.

LocationDharmapasha, Netrokona
ClientMango Limited
Contract valueBDT 7.50 Million
Duration1 Year
RoleSubcontracting from ARIDOD Tech Serve Ltd.
Profile statusOngoing
  • Piling works for electric towers
  • Foundation-related site execution
  • Solar-power transmission support works
Pagla STP Plant — CCTV, Lighting, Boundary Wall & Civil Works Ongoing
Civil / ELV / Lighting

Pagla STP Plant — CCTV, Lighting, Boundary Wall & Civil Works

Supply and installation package combining ELV, lighting and civil works at the Pagla STP Plant.

LocationNarayanganj, Dhaka
EmployerVA TECH WABAG LIMITED
Funding agencyVA TECH WABAG LIMITED
ValueBDT 1.2 Crore
RoleAFRAZ Supplier International — Sub Contractor
Profile statusOngoing
  • CCTV surveillance installation
  • Attendance system
  • Lighting system installation
  • Boundary wall construction
  • Shuttering
  • Brick work
  • Lighting pole installation
Reconstruction / New Construction / Rehabilitation of Sewerage Network — Zone E1A + E1B Tentative completion: Jul 2028
Sewerage Infrastructure

Reconstruction / New Construction / Rehabilitation of Sewerage Network — Zone E1A + E1B

Sewerage-network works covering areas including Rampura, Taltola, Bashaboo, Golapbag, Ahmedbag and Saidabad.

LocationDhaka
EmployerDhaka WASA
InvestorGOB, ADB
ValueBDT 7 Million
RoleAFRAZ Supplier International — Sub Contractor
Profile statusTentative completion: July 2028
  • Site assessment and planning
  • Compliance with regulations
  • Material selection and procurement
  • Excavation and trenching
  • Pipe installation and pipe laying
  • Quality control and safety management
  • Air valves
  • Earthworks
  • Backfilling
  • Bedding
Construction of 03 Deep Tube Wells — EWS Project, Dhaka WASA Ongoing
Groundwater / Drilling

Construction of 03 Deep Tube Wells — EWS Project, Dhaka WASA

Deep-tube-well construction with drilling, development, testing and associated technical works.

LocationDhaka City
EmployerDhaka WASA
InvestorDhaka WASA
Project costBDT 50 Lac
RoleAFRAZ Supplier International — Sub Contractor
Profile statusOngoing
  • Drilling with sample collection
  • Logging, design and fixture lowering
  • Compressor wash
  • Jetting
  • Development and testing
  • Sanitary seal and verticality test
Completed portfolio

Delivered project experience

Completed assignments across aviation, water, oil pipeline, electrical transmission and solar-related infrastructure.

Fire Protection Solutions — HSIA Expansion Project (Terminal III) Completed
Aviation / Fire Protection

Fire Protection Solutions — HSIA Expansion Project (Terminal III)

Design, procurement and installation package for fire-rated doors and windows at Hazrat Shahjalal International Airport Terminal III.

LocationDhaka
EmployerAviation Dhaka Consortium (JV of Mitsubishi, Fujita & Samsung)
Funding agencyJICA
ValueBDT 0.5 Crore
RoleAFRAZ Supplier International — Sub Contractor
Profile statusCompleted
  • Design and drawing
  • Compliance with international standards (UL/BS)
  • Production management
  • Inline inspections
  • Shipping and transportation to site
  • Phase-wise installation
Construction of 23 km Raw Water Pipeline — Gandharbpur Water Treatment Plant Completed
Water Infrastructure

Construction of 23 km Raw Water Pipeline — Gandharbpur Water Treatment Plant

Raw-water pipeline construction and commissioning from Bishnondi to Gandharbpur.

LocationBishnondi to Gandharbpur
EmployerGandharpur Water Treatment SNC (Company)
InvestorADB, AFD & EIB
ValueBDT 3 Million
RoleAFRAZ Supplier International — Sub Contractor
Profile statusCompleted
  • Raw-water pipeline installation and commissioning
  • Earthworks
  • Backfilling
  • Bedding
  • Geotextile membrane
  • Embankment
  • Road crossing
  • River crossing
  • Pipe laying
  • Air valves
Transportation of Oil Through Pipeline from Chittogram to Dhaka (CDPL) Completed
Oil Pipeline

Transportation of Oil Through Pipeline from Chittogram to Dhaka (CDPL)

Oil-pipeline installation and commissioning works under the Chittogram-to-Dhaka pipeline programme.

LocationChattogram
EmployerBangladesh Army
InvestorGovernment of Bangladesh
ValueBDT 1.5 Crore
RoleAFRAZ Supplier International — Sub Contractor
Profile statusCompleted
  • Oil pipeline installation and commissioning
  • Welding
  • Non-destructive test (X-Ray)
  • Sand blasting & heat-shrink lamination
  • Trenching
  • Pipe laying
  • Cathodic protection & holiday testing
  • Backfilling
33 kV Power Transmission Line — Mirkadim Substation to Jashaldia Padma WTP Completed
Power Infrastructure

33 kV Power Transmission Line — Mirkadim Substation to Jashaldia Padma WTP

Construction and supply works for a 33 kV overhead transmission line serving the Jashaldia Padma Water Treatment Plant.

LocationJashaldia, Padma
EmployerDhaka WASA
InvestorChina CAMCE
Project costBDT 12 Million
RoleAFRAZ Supplier International — Sub Contractor
Profile statusCompleted
  • Construction of 33 kV overhead line
  • Supply of fittings & materials
  • Supply & erection of SPC poles
  • Shifting of 11 kV existing line
  • Installation of metering unit, ACR, ABS, CT/PT
  • Overhead-line length: 32.2 km
33 kV Power Transmission Line — Abdullahpur Substation to Booster Pump Station, Keraniganj Completed
Power Infrastructure

33 kV Power Transmission Line — Abdullahpur Substation to Booster Pump Station, Keraniganj

33 kV overhead-line construction and equipment installation package.

Location shown in profileJashaldia, Padma
EmployerDhaka WASA
InvestorChina CAMCE
Project costBDT 15 Million
RoleAFRAZ Supplier International — Sub Contractor
Profile statusCompleted
  • Construction of 33 kV overhead line
  • Supply of fittings & materials
  • Supply & erection of SPC poles
  • Installation of metering unit, ACR, ABS, CT/PT
  • Overhead-line length: 2 km
Electric Tower Erection — HKEG Solar Power Plant Completed
Solar / Transmission

Electric Tower Erection — HKEG Solar Power Plant

Electric tower erection works from Sunamganj to Dharmapasha under the HKEG Solar Power Plant.

LocationDharmapasha, Netrokona
EmployerMango Limited
InvestorMango Limited
Project costBDT 3.5 Crore
RoleAFRAZ Supplier International — Sub Contractor
Profile statusCompleted
  • Electric tower erection
Source note: The profile contains some internal presentation inconsistencies (for example, a “Completed Projects” section may still show an individual project status as “Ongoing”). This website follows the individual status/value fields displayed for each project rather than silently rewriting them.
Looking for relevant experience?

Talk to AFRAZ about a comparable project scope.

Contact AFRAZ